Digging the footers

Footers dug and ready to pour

Footers poured and blocks ready to lay.

Re-bar was set in the middle and the corners

Walls built and capped

The trailer carried 1 ton of rock. Shoveling from the trailer was far easier than it would have been if it had been dumped in a pile.

Drainage cloth laid on bottom followed by 3 tons of crushed concrete

Drainage fabric laid over crushed concrete. The piles of rock on top kept it in place as the growing mixture was added.